Network Working Group V. Jones Internet-Draft Entercation Info Inc. Intended status: Informational 19 November 2026 Expires: 23 May 2027 Outerprise Entry and the Four Gates for Startup Survival draft-jones-outerprise-four-gate-onboarding-00 Abstract This document describes how a startup can present an independently assessed detached service for institutional review before either party commits to integration. Outerprise Entry precedes four gates: Validation, Trust, Engagement, and Procurement. Signed records identify what an institution received and what each authorized party decided or completed. A startup can retain evidence of progress even when procurement does not follow. An Outer Pilot is a bounded evaluation within Engagement. An Outerprise Waste Metric (OWM) Card preserves the institution's reported cost comparison as an integrity attestation. Status of This Memo This Internet-Draft is submitted in full conformance with the provisions of BCP 78 and BCP 79. Internet-Drafts are working documents of the Internet Engineering Task Force (IETF). Note that other groups may also distribute working documents as Internet-Drafts. The list of current Internet- Drafts is at https://datatracker.ietf.org/drafts/current/. Internet-Drafts are draft documents valid for a maximum of six months and may be updated, replaced, or obsoleted by other documents at any time. It is inappropriate to use Internet-Drafts as reference material or to cite them other than as "work in progress." This Internet-Draft will expire on 23 May 2027. Copyright Notice Copyright (c) 2026 IETF Trust and the persons identified as the document authors. All rights reserved. This document is subject to BCP 78 and the IETF Trust's Legal Provisions Relating to IETF Documents (https://trustee.ietf.org/ license-info) in effect on the date of publication of this document. Please review these documents carefully, as they describe your rights Jones Expires 23 May 2027 [Page 1] Internet-Draft Outerprise Entry and Four Gates November 2026 and restrictions with respect to this document. Code Components extracted from this document must include Revised BSD License text as described in Section 4.e of the Trust Legal Provisions and are provided without warranty as described in the Revised BSD License. Table of Contents 1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . 2 2. Gate 1 — Validation . . . . . . . . . . . . . . . . . . . . . 3 3. Gate 2 — Trust . . . . . . . . . . . . . . . . . . . . . . . 3 4. Gate 3 — Engagement and the Outer Pilot . . . . . . . . . . . 4 5. Gate 4 — Procurement . . . . . . . . . . . . . . . . . . . . 4 6. Cost Comparison . . . . . . . . . . . . . . . . . . . . . . . 4 7. Security and Privacy Considerations . . . . . . . . . . . . . 5 8. IANA Considerations . . . . . . . . . . . . . . . . . . . . . 6 9. Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . 6 10. Informative References . . . . . . . . . . . . . . . . . . . 6 Author's Address . . . . . . . . . . . . . . . . . . . . . . . . 7 1. Introduction A first institutional review can require a startup to invest in access, integration, and exit planning before the institution has evaluated its deliverable. Outerprise Entry is a startup route that moves the first review across a detached delivery boundary. The recipient can examine the output while retaining its own intake and decision controls. O stands for Outerprise. Before entering the route, a startup identifies the service, deliverable, and recipient boundary. An independent assessment supports eligibility only for the evaluated scope. It must identify the issuer, criteria, period, limitations, and evidence supporting delivery without a standing connection to the recipient's systems, vendor code deployed in its environment, or ongoing vendor access to its core systems. A material change requires evidence covering the changed route. The visual entry marker is an orange O. Outer-Gration is the detached evaluation boundary. Outer Package Delivery (OPD) delivers the identified package and integrity information through an approved channel. This model profiles the meaning and ordering of application records. Serialization, signature suites, and adoption of a common wire format are future work. This route removes integration as a condition of first review. Time and cost effects require measurement. Jones Expires 23 May 2027 [Page 2] Internet-Draft Outerprise Entry and Four Gates November 2026 The examination approach follows [HANDOFFS] and [EXAMINATION]. The application vocabulary and its historical source are documented in [VISUAL] and [BOOK]. 2. Gate 1 — Validation The startup signs a submission that identifies the startup, intended recipient, submission identifier, assessment reference, scope, and digest of the exact package under a named digest algorithm. The recipient checks the assessor's authority, assessment provenance and applicability to the proposed route. If qualifying assessment evidence is absent, eligibility stays pending and the recipient may defer or decline. The authorized reviewer signs the Validation disposition when issuing it. A distinct signed intake acknowledgment can arrive before Validation completes. It binds the submission and package digest and establishes what the recipient acknowledged. A Validation proceed disposition opens Trust. Missing acknowledgment is reported as unconfirmed. A replacement package gets a distinct submission identifier and can reference the earlier submission for traceability. 3. Gate 2 — Trust An authorized reviewer signs a Trust disposition bound to the same submission, exact package, and qualifying Validation record. It identifies the scope, policy criteria or policy version, and outcome. Proceed authorizes Engagement for the stated scope. Defer leaves the gate pending. Decline closes that path. Record any reason the issuer authorizes for disclosure. The startup introduces the proposed OWM Card here. It identifies the equivalent deliverable, comparison period, proposed cost categories, and required sources. This proposal can accompany the package from the beginning. The completed comparison records what the institution reports during Engagement. In a synthetic example, an institution signs an intake acknowledgment, validates the assessment, then declines at Trust under its own policy. The startup retains evidence of the acknowledged package and the recorded disposition. If the recipient issues no decision, the disposition remains unresolved. Jones Expires 23 May 2027 [Page 3] Internet-Draft Outerprise Entry and Four Gates November 2026 4. Gate 3 — Engagement and the Outer Pilot Engagement covers discussions and negotiations within the approved scope. An Outer Pilot is a bounded evaluation using detached delivery. Its scope records the deliverable, evaluation period, delivery channel, acceptance criteria, and completion conditions. The parties can sign the agreed scope and subsequent milestones. A party's own signature records its own assertion. A joint milestone can carry a signature from each responsible party over the same statement. A completed OWM Card is a signed integrity attestation over the reported comparison. It records the inputs disclosed, outcome, ledger scope and period stated by the issuer, selection method, and exclusions. It may include a cryptographic commitment to undisclosed inputs for subsequent examination. The institution can retain its private ledger. An authorized examiner with access to the source records can compare them with the signed assertion and recompute the result. A discrepancy leaves the original statement available for examination. An Outer Pilot can end with a completed evaluation, a request for revision, or a decision to stop. Evidence of those outcomes remains usable even when procurement does not follow. 5. Gate 4 — Procurement Procurement is evidenced by an executed agreement under the institution's own rules. A signed procurement record references that agreement and identifies its scope. The completed Outer Pilot or any prior gate can be referenced where relevant. The model permits Procurement following Engagement without requiring an Outer Pilot. When an Outer Pilot is elected as an acceptance condition, its outcome is evaluated under the agreed terms. Fiscal sponsorship is one use case. An existing Pair Key identifies a specific sponsor-project relationship using the documented ordered concatenation of identity digests. It conveys no access or signing authority. A startup without a fiscal sponsor can still have a workspace and submission identifiers. 6. Cost Comparison For an equivalent deliverable, let E identify the enterprise route and O the detached Outerprise route. Compute adjusted costs in integer minor units of the same currency. Jones Expires 23 May 2027 [Page 4] Internet-Draft Outerprise Entry and Four Gates November 2026 K_E = C_E + T_E * V K_O = C_O + T_O * V OWM = K_E - K_O C is documented paid cost, T is whole calendar days from the agreed start to first accepted delivery, and V is the recipient's declared daily value, or zero if undeclared. Use the same time convention and acceptance criteria for both routes. C, T, and V are nonnegative. Report missing required inputs as incomplete. Identify modeled values separately from documented costs. A ratio K_E / K_O is defined only when K_O is positive and is rounded half up to two decimal places for display. In a synthetic comparison, C_E is 170,000 cents, C_O is 100,000 cents, T_E is five days, T_O is two days, and V is 5,000 cents per day. The adjusted costs are 195,000 and 110,000 cents. The OWM is 85,000 cents and the displayed ratio is 1.77. The institution assesses operational and residual risk separately. 7. Security and Privacy Considerations The evidence trail consists of individually signed events and references to their qualifying predecessors. Each signed event identifies its type, purpose, submission, package digest, scope, issuer role, and predecessor where required. A verifying recipient checks digest and signature validity and the authority of each issuer for the event. An intake signer, Trust reviewer, and contract signer can have distinct authority. An exact duplicate delivery leaves the milestone unchanged. Conflicting signed dispositions remain visible and require policy resolution before advancement. Explicit supersession preserves the old record. Claimed time and independent time evidence are reported separately. The progression is Entry, Validation, Trust, Engagement, Procurement. Only a valid proceed disposition advances Validation or Trust. Deferral pauses the relevant gate. A recorded refusal and an unresolved outcome carry different meanings. A restart after decline uses a new submission. A signed milestone can establish the observed event without implying that a later gate was reached. Jones Expires 23 May 2027 [Page 5] Internet-Draft Outerprise Entry and Four Gates November 2026 A startup may share a separately signed, privacy-limited milestone. With permission, a trusted examiner can inspect private originals and state a bounded claim, such as completion of a scoped Outer Pilot, without identifying the prior institution. The next institution verifies the examiner's authority and signature under its own policy. Omit identifiers, dates, exact scopes, or digests if they could reveal the private relationship through correlation. A digest or a redacted copy alone does not furnish that independently verifiable milestone. A Startup Ledger may record these events using an existing attestation ledger. Workspace registration, Pair Key association, package identification, and authorized signing serve distinct functions. The startup ledger can preserve the startup's submission while waiting for an institution's sign-off. An implementation may evaluate the workflow with Entercation as the first startup, recording only milestones each responsible party actually attests to. SCITT registration under [RFC9943] can provide separate evidence of registration. A transparency service's receipt and an intended recipient's acknowledgment convey different facts. Default to retaining confidential records outside public logs. 8. IANA Considerations This document requests no IANA actions. 9. Conclusion Outerprise Entry lets a startup present a scoped, independently assessed detached service. The gates document how far the submission progressed. Signed intake and gate records allow a reviewer to reconstruct the scope of the progress that was confirmed. The Outer Pilot is a bounded way to evaluate the service. Procurement retains its own evidence and authority. 10. Informative References [RFC9943] Birkholz, H., Delignat-Lavaud, A., Fournet, C., Deshpande, Y., and S. Lasker, "An Architecture for Trustworthy and Transparent Digital Supply Chains.", RFC 9943, June 2026, . [HANDOFFS] Jones, V., "V. Jones, Terminology and Architectural Patterns for Detached Evidence Delivery. Individual Internet-Draft, work in progress.", 2026, . Jones Expires 23 May 2027 [Page 6] Internet-Draft Outerprise Entry and Four Gates November 2026 [VISUAL] Jones, V., "V. Jones, Outerprise Ecosystem and Infrastructure: Visual Manual and Machine-Readable Companion. Individual Internet-Draft, work in progress.", 2026, . [EXAMINATION] Jones, V., "V. Jones, Outerprise Ecosystem and Infrastructure: An Examination Manual for Detached Evidence Delivery. Individual Internet-Draft, work in progress.", 2026, . [BOOK] Jones, V., "V. Jones, Surprise, Outerprise, Examination Edition with Addendum A (October 15, 2026), author copy archived on a W3C mailing list.", 2026, . Author's Address Vince Jones Entercation Info Inc. Email: vince@entercation.info Jones Expires 23 May 2027 [Page 7]